Base Manager Map v1.0 MudRunner
Base Manager Map v1.0 MudRunner
You have been appointed head of the previously abandoned supply base and you have a busy time. Large people from above decided to restore the station and objects in the district, your task is to complete all tasks from above. And the tasks you have are:
1. Take the fuel to the miners 10 barrels – the sawmill 1
2. Take the coils with the cable to the signalmen 6 pieces – the sawmill 2
3. Take the blocks of concrete to the construction site (the military builds there either a locator, ) 10 pcs – sawmill 3
4. Bring timber from logging 10 logs to logging
site – sawmill 4 5. Bring pipes from unfinished gas pipeline (diameter is not the same – larger diameter was assembled) 8 pcs to hand over lumber – sawmill 5
6. Bring coal for their boiler room (the mine was kind of run) – sawmill 6
7. To take equipment (boxes on the base) to geologists. 10 pcs. – sawmill. 7
We will load the cargo dynamically – we will load EO-3323 (author Glushak) New Holland W170C (authors: chekhrak, Psix19rus, yansors) K-700
default (modification of the loader Shashok75) all already in the archive
There are 6 slots for your transport, you need to have a dumper and a log truck or a semi-trailer for transportation of pipes
1 garage (open)
1 refueling
The trailer260 is ideal for transportation of pipes – it is put on all modes having defaulted semi-trailers, the trailer Pricep_bort is suitable for transportation of everything (it has a stopper of the front cart for convenience when maneuvering in reverse) read the description below, addon Samosval (author chekhrak) is put on the default KrAZ-255 The
card was tested for Kraz-260 / 260V (author msergt) Kraz-6510 / 256B2 (author chekhrak) MAZ-502 (author pokemone)
During the testing of the card it was found out that it is easier to carry most of the goods on dump trucks or take a trailer, you can leave the car with the load right at the place of unloading (machines are sufficient for this), the loading zones at all the slots standing on the sawmills are large enough to not be unloaded by an excavator on the spot, the semitrailers with the pipes are placed around the cover and uncoupled. Pipes can be carried in any quantity (I drove for 4) the excavator can unload them – all cargoes should be placed around the slots in the sawmills. The guarantee can only be given to the dump trucks mentioned above – that they can pour out all the cargo. The
points of reconnaissance are mainly there, where or where you need to bring the cargo.
Prepare fuel and repair – it will come in handy)))
Those who do not want to (can not) load into manual (skill, of course, a certain need), please pass